Mark Ornstein of Detroit | Why School Budgets Fail Without Operational Context

Mark Ornstein of Detroit in the library

Mark Ornstein of Detroit

Your budget team and your operations team barely talk. That's the problem.

Budget meetings happen in one room. Operations planning happens in another. The budget assumes certain costs will stay flat. Operations knows they're about to spike. Neither team has use over the other, so the budget is built on wishes and the operations plan fails because money isn't there. By mid-year, you're cutting things that matter because you didn't know you'd need them until you were already locked into a budget.

Most school districts separate budget from operations for a reason that made sense in 1987 and makes no sense now. Budget people are accountants. Operations people are facilities managers and logistics coordinators. They speak different languages. Budget people talk about fund codes and restricted revenue. Operations people talk about downtime and utilization rates. So they don't collaborate. The budget gets built on historical spend, and operations gets told to make do.

Capital budgets and operating budgets are two different games

A capital budget is for buildings and big equipment. An operating budget is for everything that happens day to day. Most school districts have different processes, different timelines, and different people managing each. This creates a blind spot. A new school building requires capital spending. But staffing that building, maintaining that building, operating that building, those are operating costs that don't show up until the building is already paid for. So you get a gorgeous new facility you can't afford to run.

Or take HVAC. A heating system breaks. That's an operating expense, maybe fifteen grand to repair it. But it breaks because it's forty years old and you've been patching it for years. The capital investment that would have prevented this, a phased replacement of your mechanical systems, never gets approved because capital budgets are constrained. So you spend operating money on emergency repairs instead of planning money on replacement. After five years, you've spent three times what the capital investment would have cost.

The hidden costs are where your money actually goes

Nobody budgets for the stuff that breaks. You can budget for utilities if you have decent historical data. You can budget for staff salaries. But can you budget for the emergency HVAC call at 6 a.m. because the system quit at a school with no backup heat? Can you budget for the three days a floor is closed because there's water damage and nobody knew the roof was leaking? Can you budget for the litigation costs when someone trips over a pothole in a parking lot that's been deteriorating for five years?

These aren't small line items. Ornstein has seen districts hemorrhage half a million dollars a year on deferred maintenance costs that could have been prevented with planning. A parking lot seal coat costs thirty grand and lasts a long time. Waiting until the lot fails costs two hundred grand to replace. But the thirty grand has to come from somewhere, and if the operations budget is already tight, it gets deferred. Then you have a cascade of small costs that add up to a catastrophe.

Planning across 27 schools requires actual systems

This is where the magic happens. You can't manage a 27-school district with hope and reactive spending. Ornstein built a model where operations and budget are really the same conversation. Every capital project has a five-year operating cost attached to it. New building? Here's the utility baseline, here's the staffing model, here's the maintenance schedule. Before you approve the capital spend, you know what you're committing to operationally.

The other piece is ruthless preventive scheduling. Every roof gets inspected on a three-year cycle. Every HVAC system has a maintenance contract with scheduled replacements. Every parking lot has a condition assessment and a timeline for seal coating or replacement. This sounds expensive. It's not. It's cheaper than waiting. And you can budget for it because you're not reacting. You're planning.

The budget stops being a numbers game and becomes an operational tool

When budget people have to sit across from the person who actually runs the buildings, they understand why a "one percent increase in maintenance spending" is the difference between a functioning facility and crisis management. When operations people have to defend their spending to someone who knows cost containment, they think differently about priorities. The annual budget meeting stops being a negotiation between tribes and becomes a conversation about resources aligned with reality.

The hard part is sitting down and actually building the system. The easy part is the payoff, a budget that actually funds operations, instead of operations that constantly begs for emergency money that was never allocated.

Previous
Previous

Mark Ornstein of Detroit | The Connection Between Building Conditions and Student Outcomes

Next
Next

Mark Ornstein of Detroit | What Most Schools Get Wrong About Emergency Preparedness